XOPON

Retainage Verification

Verify retainage on every pay app in 60 seconds.

XOPON audits G702/G703 retainage calculations against your contract percentage. Flags wrong rates, premature release, and math errors — with exact dollar amounts per line item.

Retainage errors XOPON catches

Wrong retainage percentage applied

Contractor applies a lower retainage % than the contract requires — either missing the threshold for reduction or applying the wrong rate from the start.

Retainage computed on ineligible stored materials

Some contracts exclude stored materials from retainage. Contractors often apply the standard rate anyway, then release too much when the item completes.

Premature retainage reduction

Contract specifies 10% until 50% completion, then 5%. Contractor switches to 5% early — or at 50% completion per their own numbers, not the certified amount.

Retainage release without substantial completion

Final retainage billed before punch list is complete, certificate of occupancy is issued, or the contract's conditions for release are met.

Math errors in retainage column

Simple arithmetic errors in column calculations that accumulate across line items and compound over multiple pay apps.

How the verification works

Enter your contract retainage percentage (typically 5% or 10%) and paste your G703 schedule of values. XOPON calculates the correct retainage for every line item using the formula:

Retainage Withheld = Retainage % × (Completed Value + Stored Materials)

Every line that doesn't match is flagged with the exact dollar discrepancy and a recommendation for the reviewer.

Run a free retainage check

Paste your schedule of values. XOPON verifies retainage on every line and returns a full report in 60 seconds.